At the end of 2023, we completed one of the most ambitious and demanding projects in our history: the full rehabilitation of the CaetanoBus factory roof, covering an area of approximately 20,000 m². This work stood out not only for its scale but, above all, for the constructive and technical challenges that required tailor-made solutions.
Challenges and Technical Complexity
The roof featured several planes, ovalized areas with steep slopes, and multiple elements crossing the waterproofing membrane — such as chimneys and metal posts.
The parapets reached heights of up to 5 meters, increasing the complexity of execution and detailing.
The pre-existing system consisted of a fragile single corrugated metal sheet, interspersed with large translucent areas, whose condition required structural reinforcements to support the new system.
Adopted Solution
We opted for the fastening technique known as the flower rivet to secure the thermal insulation boards made of polyisocyanurate (PIR), providing a solid base for our rehabilitation solution.
For the final waterproofing, we used an adhered system: KÖSTER Membrane Adhesive polyurethane glue and the KÖSTER TPO F membrane, reinforced with embedded fiberglass mesh and an inner face coated with 250 g polyester. These features allow the adhesive to bond with the membrane, securing it to the PIR boards and giving the entire system greater strength.
The translucent areas were reinforced with metal panels, and we installed 256 solar tubes to ensure natural lighting with the desired efficiency for our rehabilitation system.
Achieved Benefits and Impact
Elimination of leaks and water infiltration that compromised the comfort and functionality of the building.
Improved thermal performance, reducing thermal bridges, and stabilizing indoor temperatures.
Continuous and efficient natural lighting, with no significant loss of brightness, UVA/UVB blocking, and maintained watertightness.
Recognition and satisfaction from CaetanoBus employees, who highlighted the bright environment and thermal comfort as visible improvements in their daily work.
BEFORE REHABILITATION

FINAL RESULT

This project illustrates our approach: challenging limits, designing rigorous technical solutions, and raising the final quality in every intervention.