    Roof Rehabilitation

    EDP Headquarters Building in Castelo de Bode

    See More

    Some projects stand out not only for their scale or technical complexity, but for the significance of the place where the intervention takes place. This was the case with the roof rehabilitation of the EDP Tejo Mondego Directorate Headquarters, located next to the iconic Castelo de Bode hydroelectric power plant.

    This intervention represented a direct contribution to the preservation of a support building essential to an infrastructure where engineering, innovation, and environmental responsibility have coexisted for decades.

     

    Challenges and requirements

    Carry out works on a building integrated within a strategic energy infrastructure, subject to the highest technical and functional standards.

    Rehabilitate a roof with a complex structural configuration, comprising lightweight and solid concrete slabs, finished with zinc over lightweight screed and cork.

    Manage variable thicknesses of the levelling layer, ranging from 210 mm to 350 mm.

    Integrate multiple technical elements crossing the roof, such as skylights, walls, and irregular flashings.

    Deliver a solution that was durable, watertight, and thermally efficient, fully adapted to the building’s specific characteristics.

     

    Adopted solution

    Application of PIR (polyisocyanurate) thermal insulation boards laid on EPS spacers, ensuring both a resistant, level base and high thermal performance.

    Mechanical fixing exclusively of the PIR boards to the structural substrate, with solutions adapted to the different concrete types and existing height variations.

    Installation of a fully bonded waterproofing system, composed of:

    – KÖSTER Membrane Adhesive polyurethane glue

    – KÖSTER TPO 1.5 F membrane, reinforced with fiberglass mesh and a 250 g polyester fleece on the underside, ensuring enhanced adhesion and mechanical resistance.

    Continuous waterproofing of walls and remaining construction elements, guaranteeing maximum watertightness throughout the system.

    Replacement of the existing skylights with Solatube solar tubes, eliminating thermal bridges, ensuring a watertight connection to the waterproofing system, and enhancing energy efficiency through effective natural lighting.

     

    Results and benefits

    A roof that is 100% watertight, fully protected against infiltration.

    Significantly improved thermal performance.

    A continuous, safe system prepared to meet future climatic and functional challenges.

    An intervention aligned with the sustainability goals of the hydroelectric power plant itself.

    Added value to a strategic building supporting national energy production and management.

    DURING REHABILITATION

    FINAL RESULT

    This project once again showed that rehabilitating a roof goes far beyond the technical aspect. It is a commitment to responsibility and precision. When the building in question supports the national power grid, every detail makes a difference.

    Discover all the details here.

    CONTACT US

    Are you a customer, supplier or a talented professional? Talk to us!

      NAME*

      EMAIL*

      CITY*

      PHONE*

      BUILDING TYPE*

      TYPE OF INTERVENTION DESIRED*

      MESSAGE*

      Top
      Prudêncio
      Privacy Overview

      This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.