REHABILITATION OF METALLIC ROOFS

Pingo Doce – Barcelos

See More

 

In the rehabilitation of the metallic roof of this building, we started by reinforcing the fixings of the existing metal sheets and we used a mixed system of thermal insulation and waterproofing TPO, in which the Koster membrane was glued to the insulation, to avoid fixing the membrane to the aluminum plate, that was weak.

 

BEFORE REHABILITATION

Therefore, the TPO Koster 1.5 F membrane was used, with an additional polyester coating on the inner face, which, in addition to giving it greater resistance, allows it to be bonded to the thermal insulation with the Koster PUR polyurethane adhesive.

A complex job to carry out, not only due to the configuration it presents, but also due to the low strength aluminum sheets, based on a lightened metallic structure, of which the cover was composed, which imposed the use of special security methods.

 

FINAL RESULT

At Prudêncio we are motivated by challenges!

CONTACT US Are you a customer, supplier or a talented professional? Talk to us!

    NAME*

    EMAIL*

    CITY*

    PHONE*

    MESSAGE*

    Köster Certificate Exclusive representatives in Portugal for TPO
    CONTACT US Are you a customer, supplier or a talented professional? Talk to us!

      NAME*

      EMAIL*

      CITY*

      PHONE*

      MESSAGE*

      Top