In the rehabilitation of the School of the Bairro Cruz, we changed the existing inverted system in the roof for a traditional system, so that the thermal insulation was under waterproofing, optimizing its thermal efficiency.
The high longevity of KÖSTER’s TPO waterproofing membranes, coupled with its high UV resistance and solar reflection, allow us to advise this system, which facilitates future maintenance and provides the best aesthetic and environmental results.
Before Rehabilitation

Final Result



